Bathrooms need more than good looks. The floor must slope correctly to the drain, joints must be sealed, and the base must be waterproofed so leakage never reaches the flat below.
We tile full bathrooms, including flooring, full or half-height walls, shower areas, niches and sink counters, with anti-skid tiles where safety matters.
What is included
- Bathroom floor with slope to drain
- Full-height and half-height wall tiles
- Waterproofing coordination
- Shower niches and ledges
- Anti-skid floor tiles
- Granite / marble sink counters
Our process
- 01
Free site visit
We visit, check the surface level and take exact measurements.
- 02
Clear written quote
Per sq.ft rate, material list and timeline -- no hidden charges.
- 03
Surface preparation
Levelling, hacking or waterproofing as the site needs.
- 04
Precise installation
Laser levels, spacers and correct adhesive or mortar bed.
- 05
Clean handover
Grouting, cleaning and a final walkthrough with you.
Frequently asked questions
Do you waterproof before tiling a bathroom?
Yes. Waterproofing of the floor and lower walls is done before tiling. We recommend it on every new or renovated bathroom.
How long does a bathroom renovation take?
A standard bathroom usually takes 5 to 7 days including old tile removal, waterproofing curing and new tiling.